Platform Engineering at IMC Trading builds and runs the core platforms that power our business. This Site Reliability Engineer role within Platform Engineering is focused on security projects: embedding security into system design and infrastructure to
TIBCO BWCE Integration Architect / Senior Developer Amsterdam, Netherlands (Hybrid) Start Date: ASAP Contract: 6 Months (Extension Possible) We are seeking an experienced TIBCO BW Container Edition (BWCE) Architect / Senior Developer to join a large-scale
Are you a skilled Backend Developer (Node.js) with a passion for scalable systems and robust solutions? Do you want to be a key player in a team building the next generation of digital services? Then this
This is what we offer youGross monthly salary between € 4.105 and € 5.862 (scale 08). Thirteenth months salary and 8% holiday allowance 10% Employee Benefit Budget EUR 1,400 development budget per year Hybrid working: balance
UX/UI Designer Location: Amsterdam, NL (Beautiful office right near Leidseplein) Work Structure: Hybrid (4 days on-site, 1 day flexible remote) Experience Level: 2–4 years Type: Full-time About Creative Clicks At Creative Clicks, we move fast, think
Uren: 40 Werkplek: Utrecht, bij de opdrachtgever op locatie en remote Ervaring: Master student Wil jij praktijkervaring opdoen terwijl je voor echte klanten werkt? Heb je een passie voor het aanpakken van complexe uitdagingen en het
As a TIBCO BWCE Integration Developer, you will: Design, develop, deploy, and maintain enterprise integration solutions using TIBCO BWCE and TIBCO BusinessWorks 6.x. Build and support API, middleware, and service integration solutions based on SOA and
Deadline Date: Wednesday 10 June 2026 Requirement: JChat Engineering Support Location: Offsite Cost Not to Exceed: €398,700 Period of Performance: From contract signature until 31 December 2026 Required Security Clearance: NATO SECRET (or higher) Please do
Deadline Date: Monday 22 June 2026 Requirement: Cyber Operations Management System (COMS) Demonstration Location: Offsite Cost Not to Exceed: EUR 187,650 Period of Performance: EDC + 4 months. Estimated start date: 15 July 2026 (tentative) Required